Fox Logistics Center – Beit Shemesh

Project Details

Client: Fox Group
Location: Beit Shemesh, Israel
Project Type: Logistics Center
Scope: Large-scale steel structure (thousands of sqm)
Discipline: Advanced steel construction

Execution
The project included the design, fabrication, and installation of a complex steel structure engineered to support heavy loads and integrate advanced logistics systems. Execution was carried out under strict timelines, with full coordination between structural, operational, and system requirements to ensure seamless functionality.

The project included the construction of wide-span steel structures, enabling unrestricted movement of trains and heavy maintenance equipment. Works were carried out in close proximity to active railway lines, requiring phased execution and continuous coordination with rail systems, electrical infrastructure, and operational constraints—while maintaining uninterrupted railway activity. High levels of precision, safety, and long-term durability were achieved throughout all stages.

Added Value
Nitzanei HaEmek delivered a comprehensive solution combining engineering precision, fast execution, and adaptability to dynamic logistics needs, creating a reliable infrastructure for large-scale commercial operations.