Before
We are pleased to present the Oranim Building Elevation project in Jerusalem, a highly active building elevated by steel constructions.
In this project, all elements were pre-designed and prefabricated in factories, then assembled on-site, significantly reducing the ongoing overhead costs associated with conventional concrete construction. This advanced method ensured adherence to timelines and delivered substantial cost savings for the developer